High-performance mine site workshop with a 10 tonne overhead gantry crane at 10m clearance, connected lean-to storage and 7 large roller door access points.
Scope of Work
The requirement to support a 10 Tonne Gantry Crane at 10m high was achieved with precise Design and Engineering. Ample access was provided with 7 roller door openings at 5m x 5m and internal Personal Access Doors throughout. This structure was fabricated and delivered on time and on budget, achieving all customer performance requirements.
24m x 24m x 10m fully enclosed workshop
12m x 18m enclosed lean-to for storage
Overhanging lean-to for shading
10 tonne overhead gantry crane at 10m clearance
7 x 5m x 5m roller door openings

Project Highlights
Rangecon required a high-performance workshop structure designed and fabricated to withstand the rigors of mine site operations. Requirements included a 24m x 24m x 10m high fully enclosed Workshop area with a connected 12m x 18m enclosed Lean-To for storage, an overhanging Lean-To for shading, and allowance for a 10 Tonne Overhead Gantry Crane covering the entire workshop floor for heavy duty operations.
10 tonne gantry crane at 10m high — precision design and engineering
7 large roller door openings for ample operational access
Connected lean-to storage and shading structures